Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'Aurantia Rd. ' (1) ·
'Banana River ' (1) ·
'C-17 Canal ' (1) ·
'C-18 Canal ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-5A ' (1) ·
'CR-712 Midway Road ' (1) ·
'Cypress Creek ' (1) ·
'Deep Creek ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Gatlin Blvd ' (1) ·
'HOWARD CREEK ' (1) ·
'L-5 CANAL ' (1) ·
'Maytown Rd. ' (1) ·
'Maytown Road ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'S. R. 714 ' (1) ·
'S.R. 714 ' (1) ·
'Sottile Canal ' (1) ·
'SR-406 ' (1) ·
'SR-44 ' (1) ·
'SR-442 ' (1) ·
'SR-50 ' (1) ·
'SR-518 ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-76 ' (1) ·
'Ten Mile Creek ' (1) ·
'Tide Relief Canal ' (1) ·
'Tillman Canal ' (1) ·
'US-92 ' (1) ·
Sottile Canal (1)
'Banana River Drive' (1) ·
'CR-3 ' (1) ·
'CR-512 ' (1) ·
'CR-880 ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-A1A ' (1) ·
'WB Blue Heron Blvd' (1) ·
'WESTMORELAND BLVD ' (1) ·
I-95 (1)
Number 008:
'.5 miles South of SR-70 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'1 Mile East of I-95 ' (1) ·
'2.3 Miles South of SR-40 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'4.5 Mi. N of SR-46 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'A1A on Singer Island ' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 NB - SR-44 ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 over Midway Road ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'I-95 SB - Sottile Canal ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'I-95 SB over US-92 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'NB I-95 / SR 714 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95 / SR-714 ' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
I-95 NB - Sottile Canal (1) ·
I-95 NB and CR-5A (1)
Latitude 016:
Longitude 017:
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 42 results in range #1 to #42.
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch