Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'AUDUBON BLVD. ' (1) ·
'Babcock St(CR-507)' (1) ·
'CR-4118 ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'Jungle Road ' (1) ·
'Maytown Road ' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SR-46 ' (1) ·
'SR-520 EB ' (1) ·
'WEST OCEAN DRIVE ' (1) ·
Grant Rd. (1) ·
Micco Rd. (1) ·
Valkaria Road (1)
700102 (1) ·
700137 (1) ·
700156 (1) ·
700157 (1) ·
700158 (1) ·
700159 (1) ·
700160 (1) ·
790028 (1) ·
790029 (1) ·
790066 (1) ·
794032 (1) ·
794080 (1) ·
930056 (1) ·
934404 (1) ·
934405 (1) ·
935300 (1) ·
935502 (1)
'0.1 mi East of Linda Road' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'At US-441/SR-7 ' (1) ·
'Babcock Street over I-95 ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1) ·
I-95 NB and CR-5A (1) ·
Valkaria Road and I-95 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)