Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'C-15 CANAL ' (1) ·
'Cabbage Slough ' (1) ·
'Canal ' (1) ·
'Carter's Canal ' (1) ·
'Cattail Outfall ' (1) ·
'Cow Creek ' (1) ·
'CR-5A ' (1) ·
'FECRR ' (1) ·
'Grant Canal ' (1) ·
'HUNGERFORD CANAL ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Maytown Rd. ' (1) ·
'Maytown Road ' (1) ·
'Outfall ' (1) ·
'Outfall Ditch ' (1) ·
'Sottile Canal ' (1) ·
'SR-44 ' (1) ·
'SR-442 ' (1) ·
'St Johns River Relief ' (1) ·
'Sunshine Canal ' (1) ·
'Timothy's Ditch ' (1) ·
'Turnbull Creek ' (1) ·
'Wishbone Canal ' (1) ·
I-95 (1) ·
Sottile Canal (1)
'AUDUBON BLVD. ' (1) ·
'Babcock St(CR-507)' (1) ·
'CONGRESS AVE ' (1) ·
'CR-4118 ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Jungle Road ' (1) ·
'Maytown Road ' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SR-405 ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-46 ' (1) ·
'SR-520 EB ' (1) ·
'WEST OCEAN DRIVE ' (1) ·
Grant Rd. (1) ·
I-95 (1) ·
Micco Rd. (1) ·
Valkaria Road (1)
Number 008:
'0.1 mi East of Linda Road' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.2mi. S of Williamson Rd' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4 Mi N of Grant Rd. ' (1) ·
'0.4 Mi S of Grant Rd. ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 Mi S of Micco Rd. ' (1) ·
'0.7 Mi S of SR-50 ' (1) ·
'1.2 Mi S of Grant Rd ' (1) ·
'1.5 Mi S of Grant Rd. ' (1) ·
'1.5 Mi. S of SR-514 ' (1) ·
'2.2 Mi. S of Grant Rd. ' (1) ·
'2.3Mi N of Ind. River Co.' (1) ·
'2.4Mi N of Ind. River Co.' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'6.5 Mi S of SR-44 ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'At US-441/SR-7 ' (1) ·
'Babcock Street over I-95 ' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 NB - SR-44 ' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'I-95 SB - Sottile Canal ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1) ·
I-95 NB - Sottile Canal (1) ·
I-95 NB and CR-5A (1) ·
Valkaria Road and I-95 (1)
Latitude 016:
Longitude 017:
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 42 results in range #1 to #42.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch