Template:Timeline Query

From Indian River Lagoon Project
Revision as of 17:19, November 28, 2020 by Admin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

This template is used to query the "Timeline" Cargo Table.

Use {{Timeline Query | where=name | like=Eau Gallie River Dredged | limit= 1 | template=Timeline Box}} to display a Timeline Box.


Name Eau Gallie River Dredged
Date May 13, 2019
Region Brevard County
Water Indian River
Description The district, Florida Department of Environmental Protection, state and local elected officials, and Indian River Lagoon protection advocates gathered to celebrate the completion of a two-year-long muck dredging project in the Eau Gallie River aimed at improving water quality. Attendees gathered at historic Ballard Park at the mouth of the Eau Gallie River to celebrate the removal of approximately 630,000 cubic yards of black muck from the waterway, which is a tributary of the Indian River Lagoon. The removal of such a significant amount of muck translates to the reduction of approximately 1,200 tons of nitrogen and 260 tons of total phosphorous, nutrients that contribute to algal blooms in waterways.
Source St. Johns River Water Management District