Page values for "History:Eau Gallie River Dredged 2019-05-13"

From Indian River Lagoon Project

"timeline" values

1 row is stored for this page
Name   Eau Gallie River Dredged
Date   May 13, 2019
Region   Brevard County
Water   Indian River
Description   

The district, Florida Department of Environmental Protection, state and local elected officials, and Indian River Lagoon protection advocates gathered to celebrate the completion of a two-year-long muck dredging project in the Eau Gallie River aimed at improving water quality. Attendees gathered at historic Ballard Park at the mouth of the Eau Gallie River to celebrate the removal of approximately 630,000 cubic yards of black muck from the waterway, which is a tributary of the Indian River Lagoon. The removal of such a significant amount of muck translates to the reduction of approximately 1,200 tons of nitrogen and 260 tons of total phosphorous, nutrients that contribute to algal blooms in waterways.

Source   St. Johns River Water Management District
SourceURL   https://www.sjrwmd.com/history/2019-year/
Poster   Admin
Posted   20191224145709