You do not have permission to edit this page, for the following reasons:
Water Body Name
Name is preset at the form start. Admin edit only.
If this is a new entry and you need to change the name, return to the start of the form.
If this is an existing entry and you need to change the name, create a new listing with the correct title and then delete the improperly titled listing.
*Water Body Type: LagoonRiverCreekCanalInletPort
Water Body ID:
*Main Basin: Halifax RiverMosquito LagoonIndian RiverBanana River
*County: VolusiaBrevardIndian RiverSaint LucieMartinPalm Beach
*Coordinates:
Enter the GIS Coordinates (ex: 28.082699, -80.594990) or zoom in on the map and click on the bridge location. The locate by address method isn't working yet. Leave blank for no map.
*Description
Addison Creek runs through Brevard County's Enchanted Forest Nature Sanctuary before entering the Indian River lagoon at Addison Point, Florida,
Enter a short description about the water body. This description is used in Water Body Info Boxes throughout the site. Create an article if you have more than a couple paragraphs of text.
Image
Upload file
If the image already exists on the server, enter the file name. (view server images)
If the image is not on this server, upload a .jpg image from your device.
Article:
Select a related article from this site.
External Web Site Links
Enter the external site's full URL (https://...), followed by a space, then the Site Name (https://example.com Name).
Web Link 1
Web Link 2
Web Link 3
Poster:
Posted:
Free Text - Admin Only
==Addison Canal Historic Marker== [[File:Addison_Canal_Historic_Marker.jpg|330px|right|thumb|Addison Canal Narker]] In 1911, Edgar W. Ellis and J. H. Beckwith put together a consortium of developers known as the Titusville Fruit and Farm Lands Company. They acquired 22,500 acres in the western portion of the old Delespine Grant with plans to drain marshland in the St. Johns River valley, to make the land usable for agricultural purposes. By 1913, 43 miles of lateral canals had been dug and work began on the Addison/Ellis Canal, which led from Addison Creek to the outlying vegetable fields. The canal was intended to relieve flooding in the St. Johns River by diverting floodwaters to the lagoon and to transport supplies and crops from the St. Johns River to the Indian River Lagoon, ending at Addison Point. The company used the coquina rock extracted from the canal to pave roads to their fields. The marshland and sand ridges proved no problem for the equipment used, but a coquina rock ridge that runs north-south proved insurmountable, and the canal was never completed. The consortium went broke and the project was abandoned. The canal never reached a useful depth, and construction ended just east of the scrub/coquina ridge in Addison Creek.
Save page Show preview Show changes Cancel