You do not have permission to edit this page, for the following reasons:
*Event Name
Event Name is preset at the form start. Admin edit only.
If this is a new timeline entry and you need to change the Event Name, return to the start of the form.
If this is an existing entry and you need to change the name, create a new listing with the correct title and then delete the improperly titled listing.
*Event Date
JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember
Location
*Region: Brevard CountyIndian River CountyMartin CountyPalm Beach CountySaint Lucie CountyVolusia CountyFlorida East CoastFloridaUnited StatesWorldOther
Water: EstuaryHalifax RiverMosquito LagoonBanana RiverNorth Indian RiverCentral Indian RiverSouth Indian RiverEau Gallie RiverSaint Sebastian RiverSaint Lucie RiverLoxahatchee RiverAtlantic OceanOther
*Description
Enter a short description about the event.
This project diverted canal flows from the 100-square-mile Melbourne-Tillman Water Control District away from Turkey Creek and the Indian River lagoon, returning up to 43 percent of the drainage district’s discharges to the Upper St. Johns River Basin.
This description is used in a timeline display, it is not intended to be a full text area. Consider creating a new article, in addition to this timeline entry, if you have more than 256 characters of text.
Page:
Optional: Select a related Page Title from this site.
Reference Source
Optional: Enter a reference source.
Name:
URL:
Image
Timeline c-1 canal flow reversed 2017-05-11.jpg Upload file
If the image already exists on the server, enter the file name. (view server images)
If the image is not on this server, upload an image from your device.
Admin Only Fields
Poster:
Posted:
Free Text Area ==The Canal 1 Rediversion Project== Decades of drainage into Turkey Creek in southern Brevard County degraded water quality, habitat and the fisheries in the central Indian River Lagoon estuary, causing a need for a massive restoration effort. Canal 1 (C-1) is maintained by the Melbourne-Tillman Water Control District to provide flood protection to more than 80,000 people. The canal carries soils, nutrients (nitrogen and phosphorus) and large volumes of freshwater from the historic St. Johns River floodplain eastward to Turkey Creek and into the lagoon. The western two-thirds of the city of Palm Bay is within the St. Johns River’s historic drainage basin. Prior to the 1920s, these swampy lands were separated from Turkey Creek and the lagoon by the Ten-Mile Ridge — an old sand dune system that served as a natural basin divide and upon which a portion of Interstate 95 was built. The Ten-Mile Ridge was breached in 1922, and a 180-mile grid of 80 canals was dug to divert stormwater to Turkey Creek. This canal system drained the natural wetlands for conversion to agricultural use. The St. Johns River Water Management District and the Melbourne-Tillman Water Control District have re-diverted a substantial portion of the C-1 drainage to a retention area west of I-95. Stormwater stored in the retention area is pumped into a wetland treatment system, known as Sawgrass Lake Water Management Area, before draining into the St. Johns River. The Sawgrass Lake Water Management Area provides the filtration needed to remove pollutants before water drains into the river.
Save page Show preview Show changes Cancel