You do not have permission to edit this page, for the following reasons:
<Back to Terms and Definitions
Fill out the form and press save page. * Fields are required.
Review your post and if needed, press "enter with form" to make changes.
Term
The Term is preset at the form start. Admin edit only.
Return to the start of the form if you need to change the term.
Abbreviation:
Optional: Enter an abbreviation.
* Definition
Reasonable Assurance Plans (RAP) provide an implementation schedule and resource commitments that there are, or will be, pollutant loading reductions that will result in the waterbody achieving water quality targets to attain and maintain the designated use.
Enter a definition under 512 characters. Additional text can be entered in the Page Content area below.
* Definition Source URL
Enter the full url of the definition's source.
* Word Class: nounverbadjectiveadverbpronoun
Select a word class type.
Pronunciation
Audio File Name
Upload file
If the audio file already exists on the server, enter the file name. (view server files)
If the file is not on the server, upload a .mp3 audio file from your device.
Synonym
Enter similar words separated by a comma.
Example Sentence
Article
Select a related article from this site.
Relevant Web Link
Enter the full url of a related website.
Image
If the image already exists on the server, enter the file name. (view server images)
If the image is not on this server, upload an image (maximum: 800px 500KB) from your device.
Admin Only Fields
Poster:
Posted:
Term ID:
Optional: Enter Page Content <div style="width:100%;float:left;margin-top:20px;border-top:2px solid #333"> ==Mosquito Lagoon Reasonable Assurance Plan== The Mosquito Lagoon Reasonable Assurance Plan (RAP) describes the local stakeholders’ efforts to develop a robust plan to restore water quality in the Mosquito Lagoon within 15 years. Implementation of the restoration activities and projects included in this plan provides a more cost-effective and locally driven path toward attaining water quality standards. The plan includes a description of the concentration-and load-based targets to be achieved by planned restoration, adaptive management, and corrective actions if goals are not being met. The sponsors for this Reasonable Assurance Plan (RAP) are the City of Edgewater, City of New Smyrna Beach, City of Oak Hill, Florida Department of Transportation (FDOT), and Volusia County. Collectively, the sponsors have made significant investments over the past few decades to reduce pollutant loading to Mosquito Lagoon with projects such as converting wastewater treatment surface water discharges to reuse and stormwater retrofit projects. The origin for this RAP began at the June 26, 2014 Water Quality Workshop hosted by the Volusia County Council. By early 2016, the sponsors had developed Joint Project Agreements that covered topics such as authority, governance and management, funding, and responsibilities of parties and Board members for developing the RAP. Source: https://floridadep.gov/dear/alternative-restoration-plans/content/mosquito-lagoon-reasonable-assurance-plan-rap </div>
Save page Show preview Show changes Cancel