Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12240 (1) ·
12259 (1) ·
12260 (1) ·
13783 (1) ·
13809 (1) ·
15135 (1) ·
15136 (1) ·
15271 (1) ·
15286 (1) ·
15290 (1) ·
15292 (1) ·
15723 (1) ·
15736 (1) ·
15793 (1) ·
15815 (1) ·
15865 (1) ·
15872 (1) ·
15877 (1) ·
15949 (1) ·
17896 (1) ·
18779 (1) ·
19231 (1) ·
19377 (1) ·
19458 (1) ·
19462 (1) ·
19463 (1) ·
19469 (1)
'Banana River ' (1) ·
'BARBARA BASIN ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'Brando Canal ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'Clint Moore Road ' (1) ·
'CROOKED CREEK ' (1) ·
'Deep Creek ' (1) ·
'DITCH NO. 34 ' (1) ·
'DITCH NO. 46 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'S-135 Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SWEETIE SLOUGH ' (1) ·
Indian River Relief East (1)
'Banana River Drive' (1) ·
'Barracuda Blvd. ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-3 ' (1) ·
'CR-512 ' (1) ·
'HARRIS RD ' (1) ·
'ISLAND RD. ' (1) ·
'Levee Road ' (1) ·
'Military Trail ' (1) ·
'Park Road ' (1) ·
'S. LAKE DRIVE ' (1) ·
'SIMARA STREET ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'ST LUCIE BLVD ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'SW Wood St. ' (1) ·
'Trailwood Drive ' (1) ·
'Wilden Road ' (1) ·
SR-520 (1)
700196 (1) ·
704063 (1) ·
704085 (1) ·
704086 (1) ·
794081 (1) ·
795700 (1) ·
796414 (1) ·
880041 (1) ·
880042 (1) ·
890800 (1) ·
894014 (1) ·
894049 (1) ·
895501 (1) ·
895505 (1) ·
930416 (1) ·
930438 (1) ·
930460 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
931000 (1) ·
934212 (1) ·
934282 (1) ·
934470 (1) ·
934491 (1) ·
934515 (1) ·
935303 (1)
'.15 mi W of Fleming Grant' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.13mi NW from N Causeway' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1 MI N OF SR-60 ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2.3 Miles South of SR-40 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'3.7 MILES NORTH OF SR-60 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'SR-80 & Military Trail ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
SR-520 - Indian River Relief (1)
26220464 (1) ·
26243201 (1) ·
26252844 (1) ·
26291118 (1) ·
26314057 (1) ·
26322160 (1) ·
26403700 (1) ·
26405365 (1) ·
26410344 (1) ·
26413216 (1) ·
26423844 (1) ·
26455204 (1) ·
26484825 (1) ·
27044705 (1) ·
27052700 (1) ·
27091468 (1) ·
27104516 (1) ·
27111437 (1) ·
27391964 (1) ·
27414386 (1) ·
27512287 (1) ·
27512302 (1) ·
28085715 (1) ·
28212382 (1) ·
29020655 (1) ·
29060108 (1) ·
29094220 (1)
80044372 (1) ·
80052654 (1) ·
80053227 (1) ·
80064300 (1) ·
80075210 (1) ·
80092158 (1) ·
80101495 (1) ·
80101701 (1) ·
80111512 (1) ·
80111729 (1) ·
80120030 (1) ·
80153155 (1) ·
80183914 (1) ·
80210453 (1) ·
80295638 (1) ·
80312618 (1) ·
80312721 (1) ·
80334956 (1) ·
80362216 (1) ·
80383434 (1) ·
80383595 (1) ·
80393900 (1) ·
80413113 (1) ·
80423456 (1) ·
80545924 (1) ·
80591575 (1) ·
81232464 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 27 results in range #1 to #27.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)