Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'17th Avenue North ' (1) ·
'BRITT CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'Lateral Canal 30 ' (1) ·
'Lateral H Canal ' (1) ·
'Military Trail ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SR-40 ' (1) ·
'SR-514 ' (1) ·
'US-192 ' (1) ·
'WPB Canal (C-51) ' (1) ·
'Yacht Club Cut ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'97 TH STREET ' (1) ·
'BRITT RD ' (1) ·
'Crosstown Parkway ' (1) ·
'Fifth Street ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'ISLAND ROAD ' (1) ·
'Levee Road ' (1) ·
'MISSION HILL ROAD ' (1) ·
'Service Road ' (1) ·
I-95 (1)
700202 (1) ·
700209 (1) ·
700222 (1) ·
700229 (1) ·
790193 (1) ·
795701 (1) ·
880049 (1) ·
884003 (1) ·
884024 (1) ·
884036 (1) ·
884063 (1) ·
884064 (1) ·
884083 (1) ·
894000 (1) ·
930259 (1) ·
930378 (1) ·
930446 (1) ·
930455 (1) ·
930811 (1) ·
934517 (1) ·
935305 (1) ·
936802 (1) ·
944018 (1)
'0.1mi E of Riverside Dr ' (1) ·
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'1Mi W of US-1 ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'AT 141st ST ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'I-95 - SR-514 ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 over US-192 ' (1) ·
'Just west of I-95 ' (1) ·
'Lake Worth ' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
26284041 (1) ·
26290100 (1) ·
26294400 (1) ·
26381065 (1) ·
26391800 (1) ·
26410978 (1) ·
26414288 (1) ·
26504000 (1) ·
27140482 (1) ·
27174425 (1) ·
27370119 (1) ·
27412300 (1) ·
27412374 (1) ·
27424275 (1) ·
27461915 (1) ·
27464527 (1) ·
27473810 (1) ·
27595475 (1) ·
28044400 (1) ·
28134900 (1) ·
28314000 (1) ·
29004760 (1) ·
29152514 (1)
80023337 (1) ·
80040620 (1) ·
80041600 (1) ·
80044085 (1) ·
80050470 (1) ·
80061820 (1) ·
80102658 (1) ·
80170422 (1) ·
80221334 (1) ·
80251400 (1) ·
80274465 (1) ·
80274529 (1) ·
80284675 (1) ·
80365044 (1) ·
80365155 (1) ·
80365186 (1) ·
80374985 (1) ·
80422199 (1) ·
80430700 (1) ·
80492277 (1) ·
80510650 (1) ·
80545465 (1) ·
81065740 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
1000 (1) ·
111908 (1) ·
1124 (1) ·
114510 (1) ·
117980 (1) ·
118848 (1) ·
126 (1) ·
1301 (1) ·
1320 (1) ·
1388 (1) ·
15000 (1) ·
232 (1) ·
27150 (1) ·
278468 (1) ·
3500 (1) ·
352347 (1) ·
4 (1) ·
409460 (1) ·
4320 (1) ·
63328 (1) ·
82412 (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)