Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C-18 Canal ' (1) ·
'Creek ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'Holly Drive ' (1) ·
'L-19 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'SR 60 ' (1)
'21ST ST SW ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CR-717 ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'I-95 (SR 9) ' (1) ·
'Indian Lake Road ' (1) ·
'Indiantown Rd. ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Levee Road ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'VETERANS WALK ' (1)
790801 (1) ·
880102 (1) ·
884038 (1) ·
884047 (1) ·
885808 (1) ·
930015 (1) ·
930072 (1) ·
930325 (1) ·
930391 (1) ·
930412 (1) ·
930447 (1) ·
930517 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934126 (1) ·
934924 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-95 over SR-60 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
121 (1) ·
133595 (1) ·
150 (1) ·
171592 (1) ·
180 (1) ·
20 (1) ·
200 (1) ·
2186 (1) ·
297552 (1) ·
51387 (1) ·
6 (1) ·
75473 (1) ·
9 (1) ·
99763 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)