Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'SLOUGH ' (1) ·
'Sykes Creek ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'Crosstown Parkway ' (1) ·
'E Gateway Blvd ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Haverhill Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'INDIANTOWN RD. ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'Lake Worth Road ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'YAMATO RD ' (1)
700193 (1) ·
930319 (1) ·
930375 (1) ·
930401 (1) ·
930413 (1) ·
930434 (1) ·
930456 (1) ·
931004 (1) ·
934142 (1) ·
934144 (1) ·
934208 (1) ·
934213 (1) ·
934295 (1) ·
934902 (1) ·
934928 (1) ·
945274 (1)
'0.1MI W OF I-95 ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7 miles North of SR 706' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)