Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-24 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'SR 60 ' (1) ·
'Sykes Creek ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'Crosstown Parkway ' (1) ·
'E Gateway Blvd ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Indiantown Rd. ' (1) ·
'Lake Worth Road ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'YAMATO RD ' (1)
700193 (1) ·
880102 (1) ·
930015 (1) ·
930319 (1) ·
930325 (1) ·
930391 (1) ·
930401 (1) ·
930412 (1) ·
930413 (1) ·
930434 (1) ·
930447 (1) ·
930456 (1) ·
931004 (1) ·
934208 (1) ·
934213 (1) ·
934902 (1) ·
934924 (1) ·
934928 (1) ·
945274 (1)
'.5 mi East of I-95 ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
133595 (1) ·
171592 (1) ·
30710 (1) ·
32445 (1) ·
45978 (1) ·
51387 (1) ·
52917 (1) ·
58990 (1) ·
67665 (1) ·
69400 (1) ·
70268 (1) ·
75473 (1) ·
78075 (1) ·
79810 (1) ·
85015 (1) ·
99763 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)