Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-24 Canal ' (1) ·
'Canal - D ' (1) ·
'E-1 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E1 CANAL ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'Sykes Creek ' (1) ·
'WPB STUB CANAL ' (1)
'Atlantic Ave. ' (1) ·
'BELVEDERE RD ' (1) ·
'Boynton Beach Blvd' (1) ·
'Crosstown Parkway ' (1) ·
'E Gateway Blvd ' (1) ·
'Indiantown Rd. ' (1) ·
'LINTON BLVD ' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'US-27 (SR-25) ' (1) ·
'US-98 (SR-80) ' (1) ·
'YAMATO RD ' (1)
700193 (1) ·
930319 (1) ·
930342 (1) ·
930374 (1) ·
930402 (1) ·
930434 (1) ·
930463 (1) ·
930464 (1) ·
931009 (1) ·
931010 (1) ·
934208 (1) ·
934485 (1) ·
934928 (1) ·
945274 (1)
'0.1MI W OF I-95 ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)