Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'C-18 Canal ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'E-1 CANAL ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 ' (1) ·
'Jupiter Creek ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'South Relief Canal ' (1) ·
'SR 60 ' (1) ·
'SR-46 ' (1) ·
'Turkey Creek ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
'CR-516 ' (1) ·
'I-95 ' (1) ·
'Indiantown Rd. ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
SR-520 (1) ·
US-1 (1)
700188 (1) ·
700192 (1) ·
700203 (1) ·
700206 (1) ·
700230 (1) ·
880089 (1) ·
880100 (1) ·
880101 (1) ·
880102 (1) ·
880105 (1) ·
930015 (1) ·
930265 (1) ·
930325 (1) ·
930391 (1) ·
930412 (1) ·
930414 (1) ·
930415 (1) ·
930420 (1) ·
930447 (1) ·
934297 (1) ·
934924 (1)
'.5 mi East of I-95 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'CR-516 over I-95 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 over SR-60 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
26205893 (1) ·
26220391 (1) ·
26220396 (1) ·
26220527 (1) ·
26221756 (1) ·
26233940 (1) ·
26401030 (1) ·
26420393 (1) ·
26502106 (1) ·
26560189 (1) ·
26560311 (1) ·
27361889 (1) ·
27363540 (1) ·
27364168 (1) ·
27382038 (1) ·
27460370 (1) ·
28015978 (1) ·
28020728 (1) ·
28100028 (1) ·
28212829 (1) ·
28395825 (1)
80055515 (1) ·
80064817 (1) ·
80074659 (1) ·
80074689 (1) ·
80083165 (1) ·
80085094 (1) ·
80101354 (1) ·
80101504 (1) ·
80101677 (1) ·
80102169 (1) ·
80121038 (1) ·
80225645 (1) ·
80304170 (1) ·
80304412 (1) ·
80310299 (1) ·
80330480 (1) ·
80344732 (1) ·
80365438 (1) ·
80384071 (1) ·
80392393 (1) ·
80521049 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
133595 (1) ·
171592 (1) ·
28628 (1) ·
33399 (1) ·
45110 (1) ·
45978 (1) ·
51387 (1) ·
6000 (1) ·
73738 (1) ·
75472 (1) ·
75473 (1) ·
82412 (1) ·
84148 (1) ·
86750 (1) ·
96292 (1) ·
99763 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)