Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'Lateral H Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SLOUGH ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-40 ' (1) ·
'SR-514 ' (1) ·
'US-192 ' (1) ·
'WPB Canal (C-51) ' (1) ·
Addison Canal (1) ·
Indian River Relief East (1) ·
Wickham Road (1)
'53rd Street ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'Crosstown Parkway ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'INDIANTOWN RD. ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
I-95 (1) ·
SR-520 (1)
700196 (1) ·
700202 (1) ·
700209 (1) ·
700222 (1) ·
700229 (1) ·
790193 (1) ·
884083 (1) ·
930375 (1) ·
930416 (1) ·
930438 (1) ·
930446 (1) ·
931000 (1) ·
934142 (1) ·
934144 (1) ·
934212 (1) ·
934282 (1) ·
934295 (1) ·
934470 (1) ·
934491 (1) ·
944018 (1)
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.7 miles North of SR 706' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'I-95 - SR-514 ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 over US-192 ' (1) ·
'Just west of I-95 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
1000 (1) ·
111908 (1) ·
114510 (1) ·
117980 (1) ·
118848 (1) ·
131860 (1) ·
171592 (1) ·
185298 (1) ·
19258 (1) ·
27150 (1) ·
39905 (1) ·
43375 (1) ·
47249 (1) ·
63327 (1) ·
63328 (1) ·
78700 (1) ·
79810 (1) ·
8000 (1) ·
82412 (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)