Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'C-17 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CR 702 45th Street ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'Northlake Blvd. ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'Thompson River ' (1) ·
'WPB Drainage Canal ' (1) ·
Sebastian River (1)
'10th Ave North ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Central Blvd ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'LPGA Blvd ' (1) ·
'Military Trail ' (1) ·
'SR 710 ' (1) ·
'SR 804 ' (1) ·
'SR806 Atlantic Ave' (1) ·
US-1 (1)
700224 (1) ·
790171 (1) ·
884071 (1) ·
894062 (1) ·
930069 (1) ·
930237 (1) ·
930263 (1) ·
930289 (1) ·
930294 (1) ·
930379 (1) ·
930458 (1) ·
930460 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930534 (1) ·
930540 (1) ·
934138 (1) ·
934360 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'10th Ave North over I 95 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'At CR-613 ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 / SR 882 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Just West of I 95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'SR-80 & Military Trail ' (1) ·
US-1 over Sebastian River (1)
11011 (1) ·
15300 (1) ·
15800 (1) ·
160500 (1) ·
18700 (1) ·
19700 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
28500 (1) ·
34500 (1) ·
38500 (1) ·
40500 (1) ·
43000 (1) ·
48500 (1) ·
7700 (1) ·
9500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
114000 (1) ·
13360 (1) ·
19104 (1) ·
26546 (1) ·
27413 (1) ·
278468 (1) ·
32445 (1) ·
34180 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
49448 (1) ·
59858 (1) ·
66798 (1) ·
70268 (1) ·
74605 (1) ·
84148 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)