Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Callalisa Creek ' (1) ·
'CANAL C-24 ' (1) ·
'E-1 CANAL ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'L-6 Canal ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LAT CANL #45(GLADES INT)' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Summit Boulevard ' (1)
'Becker Road ' (1) ·
'Crosstown Parkway ' (1) ·
'HYPOLUXO RD. ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'MARINA BLVD. ' (1) ·
'MILITARY TRAIL ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-44 ' (1) ·
'SR-807 Congress Av' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 N/S TPK 93.3 ' (1)
790151 (1) ·
930172 (1) ·
930291 (1) ·
930333 (1) ·
930336 (1) ·
930466 (1) ·
931001 (1) ·
931006 (1) ·
934318 (1) ·
934344 (1) ·
934943 (1) ·
940160 (1) ·
940161 (1) ·
945272 (1)
'0.5MI. W OF I-95 ' (1) ·
'0.75 mile South of SR 708' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'SR-44 - Callalisa Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
136198 (1) ·
148776 (1) ·
171592 (1) ·
18218 (1) ·
184778 (1) ·
199525 (1) ·
20400 (1) ·
28801 (1) ·
30363 (1) ·
3123 (1) ·
47712 (1) ·
52050 (1) ·
61593 (1) ·
72002 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)