Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'Canal - D ' (1) ·
'E-1-E CANAL ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'Frazier Creek ' (1) ·
'Halifax River ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ICWW ' (1) ·
'Indian River Relief ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'Kellers Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'SR-68 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'Tillman Canal ' (1)
'CRESTWOOD BLVD. ' (1) ·
'Gateway Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Indiantown Rd. ' (1) ·
'LINTON BLVD ' (1) ·
'Linton Blvd. ' (1) ·
'MARINA BLVD. ' (1) ·
'Minton Road CR-509' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR-5 (US-1) ' (1) ·
'SR-518 ' (1) ·
'SR-60 ' (1) ·
'SR-A1A ' (1) ·
'SR802 (Lake Worth)' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-1 ' (1) ·
'US-98 (SR-80) ' (1) ·
'Woolbright Road ' (1)
700007 (1) ·
700008 (1) ·
700183 (1) ·
704075 (1) ·
790147 (1) ·
880087 (1) ·
890002 (1) ·
930032 (1) ·
930073 (1) ·
930301 (1) ·
930307 (1) ·
930374 (1) ·
930402 (1) ·
930486 (1) ·
930487 (1) ·
930488 (1) ·
930489 (1) ·
934296 (1) ·
934363 (1) ·
934485 (1) ·
934944 (1) ·
934986 (1) ·
940096 (1) ·
940097 (1) ·
940102 (1)
'.4mi. East of Congress ' (1) ·
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'1 mile North of SR 80 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'300' E of FL Turnpike ' (1) ·
'4 miles west of SR 7 ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I 95 Exit 56 ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-5 S of Roosevelt BR ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
25564070 (1) ·
26195136 (1) ·
26262127 (1) ·
26262244 (1) ·
26271298 (1) ·
26305200 (1) ·
26325823 (1) ·
26342000 (1) ·
26370205 (1) ·
26405778 (1) ·
26412597 (1) ·
26412600 (1) ·
26413720 (1) ·
26413785 (1) ·
26421351 (1) ·
27114950 (1) ·
27245645 (1) ·
27264995 (1) ·
27265210 (1) ·
27390707 (1) ·
28004932 (1) ·
28070512 (1) ·
28072700 (1) ·
28081497 (1) ·
29083964 (1)
80035422 (1) ·
80035976 (1) ·
80040125 (1) ·
80040535 (1) ·
80041000 (1) ·
80041990 (1) ·
80050085 (1) ·
80055081 (1) ·
80074904 (1) ·
80075116 (1) ·
80101847 (1) ·
80115706 (1) ·
80142395 (1) ·
80152514 (1) ·
80162947 (1) ·
80225301 (1) ·
80231716 (1) ·
80233690 (1) ·
80233991 (1) ·
80360766 (1) ·
80374336 (1) ·
80375049 (1) ·
80401977 (1) ·
80590233 (1) ·
80901477 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)