Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'6th Avenue South ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CR 702 45th Street ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'M CANAL ' (1) ·
'Northlake Blvd. ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'TEN MILE CREEK ' (1) ·
'WPB Drainage Canal ' (1)
'EB US 98 SR 80 ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Quantum Blvd. ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'US-1 ' (1) ·
'W. CAMINO REAL ' (1) ·
'WB US 98 SR 80 ' (1)
790013 (1) ·
884076 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930294 (1) ·
930458 (1) ·
930461 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930524 (1) ·
930540 (1) ·
934256 (1) ·
934406 (1) ·
936375 (1) ·
940072 (1) ·
940101 (1) ·
940152 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Boca Raton ' (1) ·
'I-95 / SR 882 ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'US-1 over 11th Canal ' (1)
102500 (1) ·
10600 (1) ·
15600 (1) ·
160500 (1) ·
17200 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
24500 (1) ·
26000 (1) ·
28250 (1) ·
2880 (1) ·
29307 (1) ·
40300 (1) ·
90500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
157018 (1) ·
177838 (1) ·
18391 (1) ·
27066 (1) ·
278468 (1) ·
29842 (1) ·
3600 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
42508 (1) ·
45110 (1) ·
49014 (1) ·
50848 (1) ·
69920 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)