Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'BOLLES CANAL (L-21) ' (1) ·
'BOYNTON CANAL ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'E-1 Canal ' (1) ·
'Holly Drive ' (1) ·
'Lateral C Canal ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'M CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'TEN MILE CREEK ' (1)
'Atlantic Ave. ' (1) ·
'Boynton Beach Blvd' (1) ·
'EB US 98 SR 80 ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-95 (SR 9) ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Quantum Blvd. ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'US-1 ' (1) ·
'US-27 (SR-25) ' (1) ·
'W. CAMINO REAL ' (1) ·
'WB US 98 SR 80 ' (1)
790013 (1) ·
884076 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930342 (1) ·
930461 (1) ·
930463 (1) ·
930464 (1) ·
930517 (1) ·
930524 (1) ·
931009 (1) ·
931010 (1) ·
934256 (1) ·
934406 (1) ·
936375 (1) ·
940072 (1) ·
940101 (1) ·
940152 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Boca Raton ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'US-1 over 11th Canal ' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12318 (1) ·
136198 (1) ·
157018 (1) ·
157712 (1) ·
177838 (1) ·
18391 (1) ·
27066 (1) ·
27760 (1) ·
27934 (1) ·
297552 (1) ·
29842 (1) ·
3600 (1) ·
42508 (1) ·
45110 (1) ·
49014 (1) ·
50848 (1) ·
69920 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)