Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'C-24 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CSX RR ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD E1 CANAL ' (1) ·
'M CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Sykes Creek ' (1) ·
'TEN MILE CREEK ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'Crosstown Parkway ' (1) ·
'E Gateway Blvd ' (1) ·
'EB US 98 SR 80 ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Quantum Blvd. ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'US-1 ' (1) ·
'W. CAMINO REAL ' (1) ·
'WB US 98 SR 80 ' (1) ·
'YAMATO RD ' (1)
700193 (1) ·
790013 (1) ·
884076 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930319 (1) ·
930433 (1) ·
930434 (1) ·
930461 (1) ·
930524 (1) ·
934208 (1) ·
934256 (1) ·
934406 (1) ·
934928 (1) ·
936375 (1) ·
940072 (1) ·
940101 (1) ·
940152 (1) ·
945274 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Boca Raton ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'US-1 over 11th Canal ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)