Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'CR 702 45th Street ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'FL TPK SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'Northlake Blvd. ' (1) ·
'RCA CANAL ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-507 ' (1) ·
'WPB Drainage Canal ' (1)
'27th Street ' (1) ·
'57th Street ' (1) ·
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'Military Trail ' (1) ·
'NW 13 ST ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1) ·
'SUMMIT BLVD ' (1)
700186 (1) ·
884077 (1) ·
884093 (1) ·
930294 (1) ·
930338 (1) ·
930458 (1) ·
930460 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934367 (1) ·
934499 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At East Canal St. ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 / SR 882 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'SR-80 & Military Trail ' (1)
26203857 (1) ·
26214151 (1) ·
26281579 (1) ·
26281595 (1) ·
26322120 (1) ·
26342040 (1) ·
26362838 (1) ·
26363210 (1) ·
26391930 (1) ·
26394749 (1) ·
26403700 (1) ·
26411023 (1) ·
26440030 (1) ·
26445836 (1) ·
26453240 (1) ·
26465960 (1) ·
26483165 (1) ·
26501410 (1) ·
27385110 (1) ·
27415031 (1) ·
28040738 (1)
80035203 (1) ·
80040740 (1) ·
80041030 (1) ·
80042035 (1) ·
80051796 (1) ·
80052073 (1) ·
80052775 (1) ·
80052810 (1) ·
80054960 (1) ·
80055370 (1) ·
80055680 (1) ·
80064300 (1) ·
80065459 (1) ·
80074101 (1) ·
80074938 (1) ·
80075060 (1) ·
80102300 (1) ·
80242065 (1) ·
80274502 (1) ·
80371675 (1) ·
80400416 (1)
1000 (1) ·
10900 (1) ·
111000 (1) ·
11900 (1) ·
12100 (1) ·
14600 (1) ·
160500 (1) ·
17300 (1) ·
18000 (1) ·
18800 (1) ·
21000 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
23500 (1) ·
27000 (1) ·
3000 (1) ·
43000 (1) ·
9100 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
15789 (1) ·
18912 (1) ·
192590 (1) ·
2020 (1) ·
20647 (1) ·
20994 (1) ·
25331 (1) ·
278468 (1) ·
30015 (1) ·
31230 (1) ·
32618 (1) ·
36435 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
40773 (1) ·
46845 (1) ·
6940 (1) ·
74605 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)