Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Clint Moore Road ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'FL TPK SR-91 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'RCA CANAL ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-507 ' (1) ·
Indian River Relief East (1)
'27th Street ' (1) ·
'57th Street ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SUMMIT BLVD ' (1) ·
SR-520 (1)
700186 (1) ·
700196 (1) ·
884077 (1) ·
884093 (1) ·
930338 (1) ·
930416 (1) ·
930438 (1) ·
931000 (1) ·
934139 (1) ·
934212 (1) ·
934228 (1) ·
934258 (1) ·
934282 (1) ·
934361 (1) ·
934367 (1) ·
934470 (1) ·
934491 (1) ·
934499 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At East Canal St. ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
SR-520 - Indian River Relief (1)
26203857 (1) ·
26214151 (1) ·
26220464 (1) ·
26243201 (1) ·
26252844 (1) ·
26281579 (1) ·
26281595 (1) ·
26314057 (1) ·
26322120 (1) ·
26322160 (1) ·
26342040 (1) ·
26362838 (1) ·
26394749 (1) ·
26405365 (1) ·
26411023 (1) ·
26413216 (1) ·
26445836 (1) ·
26501410 (1) ·
27385110 (1) ·
27415031 (1) ·
28040738 (1) ·
28212382 (1)
80035203 (1) ·
80042035 (1) ·
80051796 (1) ·
80052073 (1) ·
80052654 (1) ·
80053227 (1) ·
80054960 (1) ·
80065459 (1) ·
80074101 (1) ·
80074938 (1) ·
80075060 (1) ·
80075210 (1) ·
80092158 (1) ·
80101495 (1) ·
80101701 (1) ·
80102300 (1) ·
80153155 (1) ·
80242065 (1) ·
80274502 (1) ·
80371675 (1) ·
80400416 (1) ·
80423456 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)