Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'FL TPK (SR-91) ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'Lateral D Canal ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'SALERNO CREEK ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'66th Avenue ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Enterprise Rd. ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Lake Worth Road ' (1) ·
'PALMETTO PK RD ' (1) ·
'Roebuck Road ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB US 98 SR 80 ' (1)
790191 (1) ·
884098 (1) ·
884099 (1) ·
894041 (1) ·
930006 (1) ·
930401 (1) ·
930413 (1) ·
930456 (1) ·
930462 (1) ·
930539 (1) ·
931004 (1) ·
931013 (1) ·
934213 (1) ·
934283 (1) ·
934902 (1)
'0.7Mi South of SR-60 ' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)