Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Callalisa Creek ' (1) ·
'CANAL C-24 ' (1) ·
'E-1 CANAL ' (1) ·
'FL TPK (SR-91) ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'L-6 Canal ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LAT CANL #45(GLADES INT)' (1) ·
'Lateral D Canal ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'SALERNO CREEK ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'Summit Boulevard ' (1)
'66th Avenue ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Enterprise Rd. ' (1) ·
'HYPOLUXO RD. ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'MARINA BLVD. ' (1) ·
'MILITARY TRAIL ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'Roebuck Road ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-44 ' (1) ·
'SR-807 Congress Av' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB US 98 SR 80 ' (1)
790151 (1) ·
790191 (1) ·
884098 (1) ·
884099 (1) ·
894041 (1) ·
930006 (1) ·
930172 (1) ·
930291 (1) ·
930333 (1) ·
930336 (1) ·
930462 (1) ·
930466 (1) ·
930539 (1) ·
931013 (1) ·
934283 (1) ·
934318 (1) ·
934344 (1) ·
934943 (1) ·
945272 (1)
'0.5MI. W OF I-95 ' (1) ·
'0.75 mile South of SR 708' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR-44 - Callalisa Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.