Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Canal C-51 ' (1) ·
'Conners Canal ' (1) ·
'FEC Railroad ' (1) ·
'Holly Drive ' (1) ·
'I-4 ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Range Line Canal ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR-520 ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'US-1 ' (1) ·
'West Palm Beach Canal ' (1)
'13th Street SW ' (1) ·
'16th Street ' (1) ·
'5th Street SW ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'I-95 (SR 9) ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LittleRanchesTrail' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-520 EB ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'US-1 (SR-5) ' (1)
700052 (1) ·
700127 (1) ·
700220 (1) ·
790082 (1) ·
790150 (1) ·
790166 (1) ·
790167 (1) ·
880085 (1) ·
884081 (1) ·
884085 (1) ·
884105 (1) ·
930410 (1) ·
930428 (1) ·
930517 (1) ·
934259 (1) ·
935920 (1) ·
940009 (1) ·
940047 (1)
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'At 74th Avenue ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'South Side of US-98 ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)