Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Canal C-51 ' (1) ·
'Conners Canal ' (1) ·
'FEC Railroad ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'I-4 ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Lateral H Canal ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Range Line Canal ' (1) ·
'SR-40 ' (1) ·
'SR-514 ' (1) ·
'SR-520 ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'US-1 ' (1) ·
'US-192 ' (1) ·
'West Palm Beach Canal ' (1) ·
'WPB Canal (C-51) ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
'13th Street SW ' (1) ·
'16th Street ' (1) ·
'53rd Street ' (1) ·
'5th Street SW ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'Crosstown Parkway ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LittleRanchesTrail' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-520 EB ' (1) ·
'US-1 (SR-5) ' (1) ·
I-95 (1)
700052 (1) ·
700127 (1) ·
700202 (1) ·
700209 (1) ·
700220 (1) ·
700222 (1) ·
700229 (1) ·
790082 (1) ·
790150 (1) ·
790166 (1) ·
790167 (1) ·
790193 (1) ·
880085 (1) ·
884081 (1) ·
884083 (1) ·
884085 (1) ·
884105 (1) ·
930410 (1) ·
930446 (1) ·
934259 (1) ·
935920 (1) ·
940009 (1) ·
940047 (1) ·
944018 (1)
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At 74th Avenue ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'I-95 - SR-514 ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 over US-192 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Just west of I-95 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'South Side of US-98 ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
26391800 (1) ·
26404846 (1) ·
26405072 (1) ·
26451984 (1) ·
27174425 (1) ·
27263922 (1) ·
27275800 (1) ·
27344850 (1) ·
27354064 (1) ·
27375400 (1) ·
27385744 (1) ·
27412300 (1) ·
27595475 (1) ·
28044400 (1) ·
28134900 (1) ·
28212632 (1) ·
28213537 (1) ·
28314000 (1) ·
28543983 (1) ·
28544052 (1) ·
29015737 (1) ·
29152514 (1) ·
29200964 (1)
80041600 (1) ·
80051590 (1) ·
80120925 (1) ·
80134871 (1) ·
80192646 (1) ·
80195440 (1) ·
80221334 (1) ·
80240150 (1) ·
80251400 (1) ·
80254929 (1) ·
80264970 (1) ·
80284500 (1) ·
80374985 (1) ·
80385322 (1) ·
80422199 (1) ·
80430700 (1) ·
80474023 (1) ·
80474142 (1) ·
80510650 (1) ·
80545970 (1) ·
81065740 (1) ·
81075240 (1) ·
81161842 (1) ·
81161879 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)