Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
Indian River Relief East (1)
700196 (1) ·
930416 (1) ·
930438 (1) ·
931000 (1) ·
931001 (1) ·
931006 (1) ·
934212 (1) ·
934282 (1) ·
934470 (1) ·
934491 (1) ·
940160 (1) ·
940161 (1)
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
136198 (1) ·
171592 (1) ·
185298 (1) ·
19258 (1) ·
30363 (1) ·
3123 (1) ·
43375 (1) ·
63327 (1) ·
78700 (1) ·
79810 (1) ·
8000 (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)