Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'BELCHER C-25 CANAL ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'CANAL ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CROOKED CREEK ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-10 Canal ' (1) ·
'L.W.D.D. #9 ' (1) ·
'MAPLE CREEK ' (1) ·
'N CANAL ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Rowland Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'TAYLOR CREEK ' (1) ·
'WILLOUGHBY CREEK ' (1)
'CR5A OLD DIXIE HWY' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DAVIS ROAD ' (1) ·
'E. CAMINO REAL ' (1) ·
'GOLDFINCH LANE ' (1) ·
'ISLAND DRIVE ' (1) ·
'ISLAND RD. ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'Levee Road ' (1) ·
'MAPP RD ' (1) ·
'S. LAKE DRIVE ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SIMARA STREET ' (1) ·
'ST LUCIE BLVD ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1)
880062 (1) ·
890102 (1) ·
894014 (1) ·
894033 (1) ·
894049 (1) ·
894056 (1) ·
895501 (1) ·
895505 (1) ·
930805 (1) ·
934408 (1) ·
934506 (1) ·
935303 (1) ·
935506 (1) ·
937202 (1) ·
937354 (1) ·
940029 (1) ·
940050 (1) ·
944014 (1)
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'300FT East of CR-717 ' (1) ·
'At ANGLE RD(CR-607A) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.