Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 Canal ' (1) ·
'C-17 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2W Canal ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'KRUEGER CREEK ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LWDD L30 Canal ' (1) ·
'ST. LUCIE RIVER ' (1)
'Atlantic Ave. ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'EB SR 704 ' (1) ·
'Hagen Ranch Road ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'W/B Atlantic Ave ' (1)
890120 (1) ·
930184 (1) ·
930210 (1) ·
930334 (1) ·
930440 (1) ·
930442 (1) ·
930463 (1) ·
931009 (1) ·
931010 (1) ·
934116 (1) ·
934958 (1) ·
944011 (1) ·
944012 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3mi. South of Linton ' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2MI E of SR-76 ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'LAKE WORTH INTERCHANGE ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
136198 (1) ·
14314 (1) ·
15040 (1) ·
157712 (1) ·
175235 (1) ·
20855 (1) ·
26459 (1) ·
27760 (1) ·
28454 (1) ·
36435 (1) ·
43202 (1) ·
55954 (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)