Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-17 CANAL ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-2W Canal ' (1) ·
'El Rio Canal ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'KRUEGER CREEK ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'ST. LUCIE RIVER ' (1)
'CR-A1A(OCEAN BLVD)' (1) ·
'EB SR 704 ' (1) ·
'Hagen Ranch Road ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB I 95 SR 9 ' (1) ·
'Spanish River Blvd' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'W/B Atlantic Ave ' (1)
890120 (1) ·
930184 (1) ·
930210 (1) ·
930334 (1) ·
930440 (1) ·
930442 (1) ·
930445 (1) ·
934116 (1) ·
934365 (1) ·
934366 (1) ·
934954 (1) ·
934958 (1) ·
935222 (1) ·
935223 (1) ·
944011 (1) ·
944012 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'2MI E of SR-76 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'LAKE WORTH INTERCHANGE ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.