Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Berrys Canal ' (1) ·
'C-23 CANAL ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Header Canal ' (1) ·
'I-95 ' (1) ·
'Jupiter Creek ' (1) ·
'South Relief Canal ' (1) ·
'SR-44 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'Tomoka River ' (1) ·
'Turkey Creek ' (1) ·
'US-92 ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
'CR-516 ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-44 ' (1) ·
'SR-808 Glades Road' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR 70 ' (1) ·
SR-520 (1) ·
US-1 (1)
700188 (1) ·
700192 (1) ·
700203 (1) ·
700206 (1) ·
790064 (1) ·
790072 (1) ·
790077 (1) ·
790078 (1) ·
790149 (1) ·
880089 (1) ·
880100 (1) ·
880101 (1) ·
890110 (1) ·
890111 (1) ·
930414 (1) ·
930415 (1) ·
930420 (1) ·
934297 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940119 (1) ·
940162 (1)
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'CR-516 over I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
26220391 (1) ·
26220396 (1) ·
26420393 (1) ·
26560189 (1) ·
27121953 (1) ·
27122261 (1) ·
27172347 (1) ·
27222475 (1) ·
27271802 (1) ·
27281041 (1) ·
27281411 (1) ·
27361889 (1) ·
27363540 (1) ·
27364168 (1) ·
28015978 (1) ·
28020728 (1) ·
28100028 (1) ·
28212829 (1) ·
29004602 (1) ·
29014148 (1) ·
29102131 (1) ·
29154558 (1) ·
29154580 (1)
80064817 (1) ·
80085094 (1) ·
80101354 (1) ·
80101677 (1) ·
80225645 (1) ·
80235637 (1) ·
80240091 (1) ·
80240291 (1) ·
80251481 (1) ·
80252971 (1) ·
80254109 (1) ·
80295022 (1) ·
80304170 (1) ·
80304412 (1) ·
80344732 (1) ·
80365438 (1) ·
80384071 (1) ·
80392393 (1) ·
80551845 (1) ·
80591757 (1) ·
81050336 (1) ·
81070414 (1) ·
81070520 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.