Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'Brando Canal ' (1) ·
'Cambridge Canal ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CROOKED CREEK ' (1) ·
'DITCH NO. 34 ' (1) ·
'DITCH NO. 46 ' (1) ·
'L-10 Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'SWEETIE SLOUGH ' (1)
704085 (1) ·
704086 (1) ·
795700 (1) ·
796414 (1) ·
880041 (1) ·
880042 (1) ·
894014 (1) ·
894049 (1) ·
895501 (1) ·
895505 (1) ·
930805 (1) ·
934515 (1) ·
935303 (1)
'.15 mi W of Fleming Grant' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.13mi NW from N Causeway' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1 MI N OF SR-60 ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'3.7 MILES NORTH OF SR-60 ' (1) ·
'300FT East of CR-717 ' (1) ·
'AT TEDDAR ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)