Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-37 Canal ' (1) ·
'Cabana Colony Circle ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'CSX RAILROAD ' (1) ·
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'None ' (1) ·
'Reed Canal ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'West Indian River Relief' (1) ·
'WILLOUGHBY CREEK ' (1)
'Americana Blvd. ' (1) ·
'Atlantic Avenue ' (1) ·
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'CR-708 ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'East Island Access' (1) ·
'INDIAN STREET ' (1) ·
'JOG ROAD (NB) ' (1) ·
'NB I 95 to Gateway' (1) ·
'NORTH 2ND STREET ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'Oak Lea Drive ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'PROSPERITY FARM RD' (1) ·
'Prosperity Farms R' (1) ·
'S. VERDE TRAIL ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'WB Forest Hill Bld' (1) ·
'West Island Access' (1)
705918 (1) ·
796548 (1) ·
890148 (1) ·
890149 (1) ·
894040 (1) ·
894064 (1) ·
930064 (1) ·
930435 (1) ·
930514 (1) ·
934137 (1) ·
934148 (1) ·
934149 (1) ·
934155 (1) ·
934156 (1) ·
934178 (1) ·
934369 (1) ·
934903 (1) ·
934951 (1) ·
937709 (1) ·
945000 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'At S Military Trail ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'West of Ernest Lyons Bri.' (1)
26212624 (1) ·
26274181 (1) ·
26322077 (1) ·
26325800 (1) ·
26350300 (1) ·
26390300 (1) ·
26432857 (1) ·
26455824 (1) ·
26455826 (1) ·
26483417 (1) ·
26483495 (1) ·
26512009 (1) ·
26512989 (1) ·
27025170 (1) ·
27102110 (1) ·
27121600 (1) ·
27123400 (1) ·
27190428 (1) ·
27270218 (1) ·
28003971 (1) ·
29093016 (1)
80024400 (1) ·
80032393 (1) ·
80035127 (1) ·
80041200 (1) ·
80041852 (1) ·
80041860 (1) ·
80051706 (1) ·
80051771 (1) ·
80074514 (1) ·
80075215 (1) ·
80075217 (1) ·
80084971 (1) ·
80102700 (1) ·
80111100 (1) ·
80115000 (1) ·
80123610 (1) ·
80151030 (1) ·
80193068 (1) ·
80222755 (1) ·
80401747 (1) ·
81001126 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.