Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Bch Blvd. ' (1) ·
'CR605 Old Dixie ' (1) ·
'E Gateway Blvd ' (1) ·
'Lake Worth Road ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-17 ' (1)
790002 (1) ·
884078 (1) ·
884079 (1) ·
884086 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
930438 (1) ·
930456 (1)
'.25 mi East of I-95 ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2.5 miles North of SR-706' (1) ·
'2.8 MI East of I-95 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'US-17 over Deep Creek ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)