Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CANAL E-8 ' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FIVE MILE CREEK ' (1) ·
'I 95 SR 9 ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'Moore's Creek ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'S. Fork St. Lucie River ' (1)
'BEL LIDO DRIVE ' (1) ·
'BOBWHITE ROAD ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'Dundas Court ' (1) ·
'DYER PARK ROAD ' (1) ·
'E Gateway Blvd ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Pinehurst Ave N ' (1) ·
'PIONEER ROAD ' (1) ·
'Riverbend Park Rd ' (1) ·
'S. VERDE TRAIL ' (1) ·
'SAM SENTER RD ' (1) ·
'SAVAGE BLVD. ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1)
704045 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
934140 (1) ·
934176 (1) ·
934221 (1) ·
934502 (1) ·
934513 (1) ·
934903 (1) ·
934905 (1) ·
935900 (1) ·
937353 (1) ·
937358 (1) ·
937359 (1) ·
940067 (1) ·
945015 (1) ·
945255 (1)
'.25 mi East of I-95 ' (1) ·
'0.1 Miles S. of Ave. D ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.5 miles North of SR-706' (1) ·
'200ft. W of A1A ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At S Military Trail ' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
26212624 (1) ·
26235789 (1) ·
26240578 (1) ·
26273366 (1) ·
26330210 (1) ·
26330220 (1) ·
26401668 (1) ·
26404244 (1) ·
26413511 (1) ·
26415742 (1) ·
26430840 (1) ·
26433343 (1) ·
26470845 (1) ·
26555800 (1) ·
26581961 (1) ·
26582109 (1) ·
27023771 (1) ·
27023967 (1) ·
27064891 (1) ·
27165946 (1) ·
27245404 (1) ·
27270500 (1) ·
28143333 (1)
80040020 (1) ·
80041240 (1) ·
80041485 (1) ·
80054734 (1) ·
80071351 (1) ·
80074514 (1) ·
80103697 (1) ·
80104046 (1) ·
80104200 (1) ·
80120021 (1) ·
80120806 (1) ·
80130371 (1) ·
80130754 (1) ·
80130890 (1) ·
80140214 (1) ·
80140445 (1) ·
80152053 (1) ·
80195680 (1) ·
80214936 (1) ·
80252443 (1) ·
80321889 (1) ·
80411355 (1) ·
80482588 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)