Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'Taylor Creek(C-25 Canal)' (1)
'2nd AVENUE NORTH ' (1) ·
'E Gateway Blvd ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'Spanish River Blvd' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR806 Atlantic Ave' (1) ·
'WB Lake Worth Rd. ' (1)
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890126 (1) ·
890127 (1) ·
930069 (1) ·
930328 (1) ·
930329 (1) ·
930433 (1) ·
930434 (1) ·
930552 (1) ·
934364 (1) ·
940009 (1) ·
940086 (1) ·
940087 (1) ·
940092 (1) ·
940093 (1) ·
940162 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'Spanish R & I95 Csxrr Can' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)