Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'CR 708 ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SW 10th St. Lowson Blvd ' (1)
'53RD STREET ' (1) ·
'E Gateway Blvd ' (1) ·
'Hull Road ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SW THIRD ST ' (1)
790079 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
930499 (1) ·
930500 (1) ·
930501 (1) ·
930502 (1) ·
930503 (1) ·
930504 (1) ·
934402 (1) ·
940068 (1)
'.25 mi East of I-95 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.5 miles South of SR 806' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'2.5 miles North of SR-706' (1) ·
'At SR-7/US-441 ' (1) ·
'E Congress Ave & S SR 806' (1) ·
'Hull Road - I-95 ' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)