Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EL CLAIR RANCH RD.' (1) ·
'NW 27TH AVE. ' (1) ·
'Pinehurst Ave N ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SR 91 TPK 120.25 ' (1) ·
'SR-40 ' (1) ·
'SR-710 Beeline Hwy' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 N/S TPK 123.9' (1) ·
'SR91 N/S TPK 124.6' (1) ·
'SR91 N/S TPK 125.2' (1) ·
'SR91 N/S TPK 125.9' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 127.3' (1) ·
'SR91 N/S TPK 127.9' (1) ·
'SR91 TPK 134.1 ' (1) ·
Fiske Blvd Ramps (1)
700180 (1) ·
704045 (1) ·
790016 (1) ·
790017 (1) ·
790018 (1) ·
790019 (1) ·
790920 (1) ·
885810 (1) ·
890067 (1) ·
890073 (1) ·
890074 (1) ·
890075 (1) ·
890076 (1) ·
890077 (1) ·
890078 (1) ·
890079 (1) ·
890082 (1) ·
890084 (1) ·
890090 (1) ·
890106 (1) ·
930241 (1) ·
930444 (1) ·
934419 (1)
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.25MI SOUTH OF SR-708 ' (1) ·
'0.45MI NORTH OF SR-708 ' (1) ·
'0.4Mi. North of SR-60 ' (1) ·
'0.51MI SOUTH OF SR-714 ' (1) ·
'0.6 Mi W of SR-11 ' (1) ·
'0.85 mile South of Linton' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'0.9MI SOUTH OF SR-708 ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.8MI NORTH OF SR-708 ' (1) ·
'2.2 MI SOUTH OF SR-76 ' (1) ·
'2.5MI NORTH OF CO LINE ' (1) ·
'3.2 Mi W of SR-11 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'6 MI N OF PLM BEACH CO LI' (1) ·
'8.9 miles west of SR-76 ' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 - Middle Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
I-95 SB Fiske Blvd Ramp (1)
26252840 (1) ·
26290227 (1) ·
26571548 (1) ·
26581931 (1) ·
26591077 (1) ·
27012706 (1) ·
27015315 (1) ·
27022544 (1) ·
27030195 (1) ·
27033219 (1) ·
27034414 (1) ·
27041173 (1) ·
27043856 (1) ·
27052013 (1) ·
27091847 (1) ·
27384120 (1) ·
28143333 (1) ·
28172130 (1) ·
29121782 (1) ·
29131903 (1) ·
29133602 (1) ·
29142807 (1) ·
29143956 (1)
80052570 (1) ·
80082019 (1) ·
80095581 (1) ·
80104223 (1) ·
80111971 (1) ·
80134794 (1) ·
80141121 (1) ·
80142184 (1) ·
80142213 (1) ·
80142789 (1) ·
80144523 (1) ·
80145730 (1) ·
80180137 (1) ·
80244948 (1) ·
80315267 (1) ·
80341739 (1) ·
80411355 (1) ·
80443123 (1) ·
81133337 (1) ·
81134830 (1) ·
81183972 (1) ·
81194815 (1) ·
81220388 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)