Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884020 (1) ·
885811 (1) ·
885812 (1) ·
930107 (1) ·
934461 (1) ·
934522 (1) ·
937005 (1) ·
937006 (1) ·
937354 (1) ·
937356 (1) ·
937714 (1) ·
945271 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.1 Mile West of A1A ' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'AT US-27 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)