Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-133 Canal ' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'E-2-E Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'Ten Mile Creek ' (1)
'Boynton Bch Blvd. ' (1) ·
'CR726 (Citrus Blv)' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E Gateway Blvd ' (1) ·
'EB SR 70 ' (1) ·
'Lake Worth Road ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'WB SR-70 ' (1) ·
'WEST OCEAN DRIVE ' (1)
890015 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
894058 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
930438 (1) ·
930456 (1) ·
935300 (1) ·
940053 (1) ·
940120 (1) ·
940156 (1)
'.25 mi East of I-95 ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2.5 miles North of SR-706' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'4.85 Miles E of SR-710 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)