Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C-23 CANAL ' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'DIRT FARM ROAD ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'Salerno Creek ' (1) ·
'TAYLOR CREEK ' (1) ·
'TAYLOR CREEK CANAL-1 ' (1) ·
'TEN MILE CREEK ' (1)
'53RD STREET ' (1) ·
'CITRUS BLVD. ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'E Gateway Blvd ' (1) ·
'Hull Road ' (1) ·
'JUPITER BEACH RD ' (1) ·
'KEEN RD (CR-611) ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'LINTON BLVD. ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SW THIRD ST ' (1)
790079 (1) ·
790084 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
894055 (1) ·
894060 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
934125 (1) ·
934402 (1) ·
934483 (1) ·
940027 (1) ·
940029 (1) ·
940037 (1) ·
940068 (1) ·
944014 (1)
'.25 mi East of I-95 ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.5MI S of CR-608 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'2.5 miles North of SR-706' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'At SR-7/US-441 ' (1) ·
'Hull Road - I-95 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)