Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Conners Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FISHTAIL CANAL ' (1) ·
'IWW Indian River ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'LWDD LAT 16 CANAL ' (1) ·
'Moore's Creek ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SW 10th St. Lowson Blvd ' (1)
790149 (1) ·
790150 (1) ·
790172 (1) ·
884068 (1) ·
930499 (1) ·
930500 (1) ·
930501 (1) ·
930502 (1) ·
930503 (1) ·
930504 (1) ·
934214 (1) ·
934319 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
945014 (1) ·
945251 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'1.5 miles South of SR 806' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'E Congress Ave & S SR 806' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-44 - Indian River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.