Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL E-106 ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE IDA CANAL ' (1) ·
'Lake Ida Road ' (1) ·
'LATERAL A CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL CANAL ' (1) ·
'N CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'Range Line Canal ' (1) ·
'TEN MILE CREEK ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'10th Street ' (1) ·
'16th Street ' (1) ·
'21ST ST SW ' (1) ·
'49th St Lindsey Rd' (1) ·
'61ST./PECAN GROVE ' (1) ·
'97 TH STREET ' (1) ·
'Apollo Boulevard ' (1) ·
'COLUMBUS DR. ' (1) ·
'GORDY ROAD ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'ISLAND DRIVE ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'Minton Rd. ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SW 22ND WAY ' (1) ·
'US-1 (SR-5) ' (1) ·
'VANDEGRIFT-WILL RD' (1)
704143 (1) ·
705604 (1) ·
790179 (1) ·
884003 (1) ·
884038 (1) ·
884047 (1) ·
884063 (1) ·
884064 (1) ·
884081 (1) ·
884103 (1) ·
930004 (1) ·
930495 (1) ·
930496 (1) ·
930497 (1) ·
930498 (1) ·
934506 (1) ·
934516 (1) ·
935306 (1) ·
935506 (1) ·
935508 (1) ·
944010 (1) ·
945267 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT 141st ST ' (1) ·
'At 74th Avenue ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'Minton Road-I-95 ' (1)
26270705 (1) ·
26280900 (1) ·
26281369 (1) ·
26281695 (1) ·
26281730 (1) ·
26302557 (1) ·
26400360 (1) ·
26442375 (1) ·
26495569 (1) ·
27124842 (1) ·
27241068 (1) ·
27335447 (1) ·
27375400 (1) ·
27405750 (1) ·
27421622 (1) ·
27461915 (1) ·
27464527 (1) ·
27473810 (1) ·
28025656 (1) ·
28073710 (1) ·
29140999 (1)
80033398 (1) ·
80033671 (1) ·
80044341 (1) ·
80052000 (1) ·
80052100 (1) ·
80052215 (1) ·
80054787 (1) ·
80213453 (1) ·
80235669 (1) ·
80255073 (1) ·
80274430 (1) ·
80274550 (1) ·
80284500 (1) ·
80321756 (1) ·
80365044 (1) ·
80365155 (1) ·
80365186 (1) ·
80384610 (1) ·
80401656 (1) ·
80491520 (1) ·
81031853 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.