Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'FISHTAIL CANAL ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'LWDD LAT 16 CANAL ' (1) ·
'Moore's Creek ' (1) ·
'Palmetto Park Road ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
884015 (1) ·
884068 (1) ·
885808 (1) ·
930187 (1) ·
930188 (1) ·
930198 (1) ·
930199 (1) ·
934214 (1) ·
934319 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
945014 (1) ·
945251 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'Boca Raton ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.