Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
794074 (1) ·
884015 (1) ·
884068 (1) ·
885808 (1) ·
934214 (1) ·
934319 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
945014 (1) ·
945251 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.7 Mi N of Old Dixie Hwy' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1)
Showing below up to 11 results in range #1 to #11.