Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'CANAL L-12 ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'KELLER CANAL E-4 ' (1) ·
'Lateral H Canal ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'North Relief Canal ' (1)
884082 (1) ·
884083 (1) ·
930107 (1) ·
930354 (1) ·
930355 (1) ·
930482 (1) ·
934404 (1) ·
934405 (1) ·
934461 (1) ·
940003 (1) ·
940004 (1) ·
940084 (1) ·
940085 (1) ·
940158 (1)
'0.23 MI N FPL POWER PLANT' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'16Mi W of SR-7 ' (1) ·
'56th Place North ' (1) ·
'At US-441/SR-7 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)