Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
704194 (1) ·
884082 (1) ·
884083 (1) ·
894050 (1) ·
934482 (1) ·
934940 (1) ·
937006 (1) ·
937714 (1) ·
945257 (1) ·
945258 (1)
'0.1 MI S OF PGA BLVD ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.75 Mi. South of SR-520 ' (1) ·
'1.2MI W OF PORT ST. LUCIE' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'56th Place North ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)