Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'E-2 Canal ' (1) ·
'E-2W Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lateral "A" Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral A Canal ' (1) ·
'Loxahatchee Slough ' (1) ·
'M CANAL ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'South Relief Canal ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1)
'16th St/College Ln' (1) ·
'33rd Street ' (1) ·
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Avenue ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR605 Old Dixie ' (1) ·
'EB SR808 Glades Rd' (1) ·
'Hatton Road ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Northlake Blvd. EB' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR-5 (US-1) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'W/B Atlantic Ave ' (1)
880103 (1) ·
880104 (1) ·
884074 (1) ·
884084 (1) ·
884086 (1) ·
884100 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
884104 (1) ·
890121 (1) ·
890122 (1) ·
890129 (1) ·
930248 (1) ·
930372 (1) ·
930440 (1) ·
930442 (1) ·
930528 (1) ·
934151 (1) ·
934168 (1) ·
934552 (1) ·
934711 (1)
'1 Mi. S of US-441 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-613 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'South of St Lucie Canal ' (1) ·
'SR 808 I 95 Interchange ' (1)
26220535 (1) ·
26251444 (1) ·
26271450 (1) ·
26404400 (1) ·
26424000 (1) ·
26424967 (1) ·
26455392 (1) ·
26483934 (1) ·
26560443 (1) ·
27063191 (1) ·
27072925 (1) ·
27073032 (1) ·
27332870 (1) ·
27332944 (1) ·
27361500 (1) ·
27363390 (1) ·
27375420 (1) ·
27391280 (1) ·
27393890 (1) ·
27400430 (1) ·
27403120 (1) ·
27405750 (1)
80050018 (1) ·
80052546 (1) ·
80070650 (1) ·
80085950 (1) ·
80102700 (1) ·
80102980 (1) ·
80103501 (1) ·
80153917 (1) ·
80164549 (1) ·
80164845 (1) ·
80182538 (1) ·
80220651 (1) ·
80220740 (1) ·
80231300 (1) ·
80264867 (1) ·
80274510 (1) ·
80274550 (1) ·
80274570 (1) ·
80274600 (1) ·
80274650 (1) ·
80274700 (1) ·
80331600 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.